This 7-mile corridor extends from downtown Reno to downtown Sparks along 4th Street. Headway has been actively involved since the planning and preliminary design phase. The final design phase includes construction-ready PS&E for signal modifications at 12 signals with signal interconnect between them, installation of 2 RRFBs, a road diet, bike lanes, and Transit Signal Priority for the new Bus Rapid Transit line.